| 5 |
 |
50mm of fibre reinforced concrete is applied. |
| 6 |
 |
After placing the insulation, fabric reinforcement is laid for the
inner leaf, together with conduits for electrical services. |
| 7 |
 |
90mm of lightweight concrete is then placed by machine and compacted |
| 8 |
 |
Internal face is rolled to produce a surface ready to receive finishes. |